The site logistics and layout for new tissue mill
The site logistics and layout for new tissue mill
- Confidentional client
- The site logistics and layout for new tissue mill
- PPI
- 2012
Banking project declaration for a New Pulp Mill
Banking project declaration for a New Pulp Mill
- Confidential client
- New Pulp Mill for ADTY production with 400 000 capacity
- PPI
- 2012
Feasibility study for fuel pellet production line project
Feasibility study for fuel pellet production line project
- Confidential client
- Feasibility study for fuel pellet production line project
- Bioenergy
- 2012
New bio oil plant
New bio oil plant
- Confidential client
- Design, technology, IAC — New bio oil plant
- Bioenergy
- 2013
TrumpJet for PM
TrumpJet for PM
- TrumpJet for PM
- Confidential client
- Arkhangelsk region, 2012
Feasibility study for a new wood yard project
Feasibility study for a new wood yard project
- Confidential client
- Feasibility study for a new wood yard project
- PPI
- 2013
Management of a timber and chemical plant project construction
Management of a timber and chemical plant project construction
- Confidential client
- Management of a timber and chemical plant project construction at the basic design stage
- PPI
- 2014-2015
Preliminary design of a wood chemical productionl line
Preliminary design of a wood chemical productionl line
- Confidentional client
- Preliminary design of a wood chemical productionl line
- PPI
- 2014
TrumpJet for BM
TrumpJet for BM
- TrumpJet for BM
- Confidential client
- Vologodsk region, 2013
Feasibility study for a new plywood plant construction
Feasibility study for a new plywood plant construction
- Confidential client
- Feasibility study for a new plywood plant construction
- Wood processing
- 2012
Management of paint manufacturing plant design
Management of paint manufacturing plant design
- Confidentional client
- Management of paint manufacturing plant design
- Chemistry
- 2014
Owner's Engineer functions
Owner's Engineer functions
- Confidential client
- Owner's Engineer for civil design at Pulp mill construction project
- PPI
- 2015-2016
TrumpJet for PM
TrumpJet for PM
- TrumpJet for PM
- Confidential client
- Arkhangelsk region, 2016
Pre-design works for construction of a new Pulp Mill
Pre-design works for construction of a new Pulp Mill
- Confidential client
- Pre-design works for construction of a new Pulp Mill
- 0.9 million tonnes of NBSK, BHKP, DWP
- PPI
- 2013
Development of design documentation
Development of design documentation
- Confidentional client
- Development of design documentation for municipal water-intake and water-treatment facilities withing the limits of AS and CS disciplines of Organizational and Technological Solutions project stage
- Engineering
- 2015
Tender management
Tender management
- Confidentional client
- Tender management for main equipment
- PPI
- 2015
TrumpJet for PM-4
TrumpJet for PM-4
- TrumpJet for PM-4
- Confidential client
- Leningrad region, 2013
Pre-design works for construction of a new Pulp Mill
Pre-design works for construction of a new Pulp Mill
- Confidential client
- Pre-design works for construction of a new Pulp Mill
- 1.1 mln. tonnes of NBSK, BHKP
- PPI
- 2013
Development of design and detailed documentation
Development of design and detailed documentation
- Confidentional client
- Development of design and detailed documentation within the limits of FEL3 stage Trumpjet system installation project
- PPI
- 2015
Feasibility study for a new bio-oil production plant project
Feasibility study for a new bio-oil production plant project
- Confidential client
- Feasibility study for a new bio-oil production plant project
- Bioenergy
- 2013
Development of а Pulp mill construction project technical standard
Development of а Pulp mill construction project technical standard
- Confidential client
- Development of а Pulp mill construction project technical standard
- PPI
- 2015
APCS systems design
APCS systems design
- Confidential client
- APCS systems design for local waste treatment plants and water treatment plants
- PPI
- 2016
Feasibility study for a new bio-oil production plant project
Feasibility study for a new bio-oil production plant project
- Confidential client
- Feasibility study for a new bio-oil production plant project
- Bioenergy
- 2013
Сonstruction concept of a new timber and chemical plant
Сonstruction concept of a new timber and chemical plant
- Confidential client
- Сonstruction concept of a new timber and chemical plant and its feasibility evaluation
- PPI
- 2013
Сonstruction concept of a new timber and chemical plant
Сonstruction concept of a new timber and chemical plant
- Confidential client
- Сonstruction concept of a new timber and chemical plant and its feasibility evaluation
- PPI
- 2014
Cost-efficiveness analysis of phytosterol plant
Cost-efficiveness analysis of phytosterol plant
- Confidential client
- Cost-efficiveness analysis of phytosterol plant
- PPI
- 2014
Concept of Russian biotechnology development
Concept of Russian biotechnology development
- Ministry of Industry and Trade of the Russian Federation
- Concept of Russian biotechnology development
- Biotechnology
- 2014
R&D for copy paper production from vegetable raw material
R&D for copy paper production from vegetable raw material
- Confidential client
- R&D for copy paper production from vegetable raw material
- PPI
- 2015
Concept of timber and chemical plant construction project
Concept of timber and chemical plant construction project
- Confidential client
- Concept of timber and chemical plant construction project
- PPI
- 2016
BCTMP Market analysis
BCTMP Market analysis
- Confidential client
- BCTMP Market analysis
- PPI
- 2013
Market analysis of waste wood pyrolysis oil
Market analysis of waste wood pyrolysis oil
- Confidential client
- Market analysis of waste wood pyrolysis oil
- PPI
- 2016
Paper production optimization, products promotion
Paper production optimization, products promotion
- Confidential client
- Paper production optimization, products promotion
- PPI
- 2013
Process audit of tissue plant
Process audit of tissue plant
- Confidential client
- Process audit of tissue plant
- PPI
- 2013
Process audit of paper machines № 5-7
Process audit of paper machines № 5-7
- JSC «Volga»
- Process audit of paper machines № 5-7. Evaluation of organizational and technical measures required for production of new items
- PPI
- 2017
Photo source:
volga-paper.ru